A predictable EPC playbook for solar, storage, and EV-ready sites.

From feasibility to commissioning and lifecycle O&M, every step is governed by checklists, QA gates, and transparent reporting.

EPC methodology

Six governed phases, one accountable team

Each phase has defined inputs, outputs, and QA artifacts—keeping projects on-time, on-budget, and on-spec.

01
Needs & feasibility

Load profile analysis, site survey, shading and structural checks, and ROI modeling.

  • Site feasibility & soil/roof checks
  • Energy + tariff analysis
  • Financial & ROI modeling
Needs & feasibility
02
Engineering & permits

Civil, mechanical, and electrical design with grid compliance and safety built-in.

  • PVsyst and string design
  • Structural & earthing layouts
  • Grid studies and drawings
Engineering & permits
03
Procurement & QA

Tier-1 modules, inverters, and BOS with factory QA, logistics, and tracked deliveries.

  • Tier-1 vendor selection
  • QA/QC at factory and site
  • Just-in-time logistics
Procurement & QA
04
Construction & HSE

Foundation, mounting, cabling, and commissioning with strict HSE protocols.

  • HSE toolbox talks & LOTO
  • Civil + mounting + DC/AC works
  • SCADA, strings, and terminations
Construction & HSE
05
Testing & commissioning

IV curves, insulation tests, PR benchmarks, and utility approvals before handover.

  • IV/IR tests & thermography
  • PR validation & FAT/SAT
  • Utility inspections & approvals
Testing & commissioning
06
O&M & performance

24/7 monitoring, preventive maintenance, and SLAs that guarantee uptime.

  • 24/7 monitoring & alerts
  • Preventive & corrective maintenance
  • Spares, PR reports, SLAs
O&M & performance

Governance & QA

Controls that keep projects predictable

PMO templates, digital checklists, and milestone gates ensure quality, safety, and transparency from NTP to PAC.

Stage gates

Design freeze, FAT/SAT, PR baseline before COD.

Grid compliance

Utility coordination, protections, and approvals.

Digital QA

Photo checklists, punch lists, and daily reports.

HSE-first

Toolbox talks, LOTO, PPE audits on every site.

Project governance

Ready to start with a feasibility call?

We will review your site, loads, and timelines, then propose an engineered path to COD with defined SLAs.